Floor levelling is a thin layer of mortar applied over an existing substrate to correct its surface defects. It makes good hollows, humps, adhesive residue or a roughness incompatible with the intended floor covering.
Its function is to prepare, not to constitute. The levelling layer follows the substrate, it does not replace it and it never corrects its structural defects.
On function, not on thickness, even though the two overlap. A screed constitutes a load-bearing layer, it can incorporate insulation, encase underfloor heating, be decoupled from the substrate. A levelling layer does none of that.
In practice, below 3 cm in bonded form, the threshold set by Buildwise technical note TV 189 for a cement-based screed, you are in the territory of levelling. The question to ask is simple: does the floor need to gain a function, or only a surface?
From one to a few millimetres for common self-smoothing products, up to around one centimetre for fibre-reinforced or filled formulations. Each product has its range, stated on its technical sheet, and exceeding it invites crazing and debonding.
Trying to make good 3 cm of level difference with a levelling compound is a classic false economy. The product is expensive per square metre at those thicknesses and it is not designed to work that way.
When the substrate is sound, at the right level, and only flatness is missing. That is the typical case of a renovation where an old floor covering is removed to lay a new one that demands more regularity.
It is not enough as soon as height must be gained, insulation added, decoupling achieved or heating embedded. In those cases only a screed answers. See our screed laying services.
Feel free to contact us directly: our team is always available to assist you and provide a 100% free quote.
No, not beyond a few millimetres. Correcting a fall implies a varying thickness that exceeds the product's field of use, with a thick point where it cracks and a thin point where it does not hold. A fall is formed in the screed, whose thickness can vary without losing strength.
What matters above all is removing anything that does not hold: laitance, dust, adhesive residue, friable patches. Sanding is one way of achieving that, shot blasting is another on a closed substrate. A levelling layer applied over a non-cohesive layer comes away with it, whatever the quality of the product.
Yes, if the levelling layer is dry, flat and compatible with the chosen method of installation. Bonded installation demands a perfectly cohesive surface, because it is the levelling layer that takes the pull-off force. Floating installation is more forgiving, but flatness remains critical to avoid hard points and creaking.
Far less time than a screed, since the amount of water to be released is not remotely comparable. Times range from a few hours to a day or two depending on the product, the thickness and the ventilation. The exact time is given on the technical sheet and is never inferred from experience with screeds.