Why does a screed sound hollow?

On a floating screed it is normal: it sits on insulation. On a bonded screed, a hollow sound signals that it has come away from the substrate.

Before getting alarmed, you need to know what type of screed you are dealing with. The same observation can be perfectly normal or reveal a serious defect, and the installation method is the deciding factor.

‍

When it is normal

A floating screed rests on a compressible insulation layer, separated by a film. It does not touch the structure anywhere: that is the whole point of the principle, which eliminates thermal and acoustic bridges. A dull, hollow sound when tapped is therefore a sign that the decoupling is working.

In this case, the hollow sound is not a symptom: it is a confirmation. It would be the opposite that should be cause for concern.

‍

When it is a defect

On a bonded screed, the mortar is supposed to be bonded to the slab. A hollow sound then signals a loss of adhesion, the usual causes of which are well known:

  • a dusty, chalky, or poorly vacuumed substrate at the time of pouring;
  • absence of a bonding slurry or primer;
  • a very dry substrate that absorbed the water from the mortar before it set;
  • shrinkage of the screed, which gradually caused it to peel away at the edges.

‍

Making the correct diagnosis

Testing is done with a steel ball or a small hammer in a regular grid pattern, and the hollow areas are marked with chalk. What matters is not finding a single hollow spot, but measuring what proportion of the surface is affected and whether the areas are grouped together or scattered.

A few isolated, small areas can be treated by pressure-injecting resin, which re-bonds the screed to its substrate. When the detachment becomes widespread, no injection will hold: removal is necessary, or covering it with a new floating screed.

‍

A common trap after tiling

When tiles sound hollow, the screed is not always to blame. A bonding defect, such as a single dab of adhesive instead of double-buttering, is enough to produce the same sound. Before blaming the screed, you must therefore check whether the hollow sound is limited to a few tiles or extends to entire areas, including the grout lines.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.