Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.

This question often comes up regarding old slabs laid without waterproofing. The answer has two parts: how PUR behaves once installed, and the conditions required for spraying it.

‍

Once installed, it absorbs very little water

The PUR used for floor insulation is a closed-cell foam. This structure significantly limits water absorption, which distinguishes it from open-cell foams. This is also what allows it to maintain its performance over time; see our data sheet sprayed PUR.

‍

During spraying, the substrate must be dry

Installation specifications require a dry, clean, and dust-free substrate, with a slab temperature of at least 5°C. On a wet surface, the foam adheres poorly and expands unevenly.

‍

It does not treat rising damp

PUR is not a waterproofing membrane. If moisture is rising from the ground, it must be treated beforehand: identify the cause, then use a membrane or vapor barrier depending on the situation. Our data sheet pouring a screed on a damp substrate details the diagnostic process.

On a slab permanently exposed to water, an XPS board may be more suitable. The choice is made on a case-by-case basis; see our floor insulation solutions.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation
Renovation

How do you measure the height available to insulate a floor?

Start from the finished floor level set by thresholds and adjoining rooms, measure down to the highest point of the slab, then subtract the floor finish and the screed: what is left is the space for insulation.

Need a reliable partner for solid screeds, or thermal or acoustic insulation?

Contact us
Arrow right icon