A screed layer is a construction professional specializing in the installation of screeds: the layer of mortar applied to a raw subfloor to create a flat, level surface ready to receive flooring.
This is a distinct trade from that of a mason or a tiler. The screed layer does not work on structural elements or final finishes. They work during the intermediate phase of a project, a stage where errors become impossible to fix once the flooring is installed.
First, mastery of materials. An anhydrite screed, a cement screed, and a lightweight mortar do not behave the same way, do not dry at the same rate, and do not withstand the same stresses.
Next, site assessment. Most defects occur before pouring, due to a poorly diagnosed substrate. Knowing when to refuse to pour until an issue is resolved is part of the job.
Finally, coordination. The screed layer works between the heating engineer and the tiler. Their schedule dictates the others', and an underestimated drying time can disrupt the entire project timeline.
Two factors set a screed specialist apart from a general contractor: adherence to drying times and precision in thickness. These are the two most common causes of cracking and flooring detachment, and they are also the two areas where tight schedules often lead to cutting corners.
Our screed solutions cover all these configurations. The most common pitfalls are detailed in our article on mistakes to avoid before pouring a screed.
Feel free to contact us directly: our team is always available to assist you and provide a 100% free quote.
A mason builds the structure of the building. The screed specialist comes in afterwards, focusing exclusively on floor preparation: insulation, screeding, and ensuring flatness and levelness before the flooring is installed.
If you need to level a floor, install insulation, or prepare a subfloor for new flooring, yes. In renovation projects, assessing the existing subfloor is the most delicate part of the job.
For most specialists, yes. Insulation is installed just before the screed, and the two operations are technically linked: the required thickness of the screed depends on the type of insulation underneath.
Installation is fast, often taking less than a day for a standard residential area. It is the drying process that takes time, ranging from a few days to several weeks depending on the type and thickness.