How do you protect a screed while it dries?

By preventing it from drying too fast in the early days: no draughts, no direct sun, no frost, and no loads placed on the surface.

The first few days of a screed are counter-intuitive. You shouldn't try to dry it quickly; you should try to prevent it from drying too fast. This is called curing, and it is what determines most subsequent defects.

‍

The first few days: slow down, don't speed up

Until the setting process is complete, the cement needs its water to finish its chemical reaction. If the surface loses this water too quickly, it shrinks more than the mass underneath, resulting in a network of fine cracks.

In practical terms, during the first two to three days:

  • keep openings closed, with no cross-drafts;
  • block direct sunlight, including through glass doors and windows;
  • keep the room frost-free, a topic detailed in our guide on pouring a screed in winter ;
  • on a cement screed, a curing film can be applied if the environment is dry or windy.

Only then should you gradually open up for ventilation to begin the actual drying process.

‍

Protecting from the rest of the construction work

A hardened screed is not a finished floor. Subsequent trades are the second leading cause of damage: dropped tools, scaffolding feet, debris left on the floor, or stacks of tiles or boards placed in the same spot.

A heavy point load on a young screed creates a puncture mark that will only become visible once the flooring is installed. If work must continue, you should roll out protective panels or boards in traffic areas and distribute material stockpiles.

‍

Common mistakes

Leaving a plastic film stuck to an anhydrite screed for too long can cause stains and delay drying. Sweeping a young screed with water to clean it is another bad idea. Finally, walking on it too soon leaves permanent footprints: see when you can walk on a fresh screed. For the rest, the list of mistakes to avoid before pouring a screed usefully completes this overview.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.

Need a reliable partner for solid screeds, or thermal or acoustic insulation?

Contact us
Arrow right icon