A crack isn't necessarily serious, but it should never be ignored. The first step isn't to fill it, but to identify it. Surface crazing and an active, widening crack require completely different treatments.
Thecrazing forms a network of fine, superficial, spiderweb-like cracks. It is caused by the surface drying too quickly. It poses no structural risk and does not prevent the installation of tiles, but it must be treated before laying flexible flooring.
Thethrough-crack is straight and runs all the way through the material. It is generally caused by restrained shrinkage: missing joints, an area that is too large, or a screed blocked against a wall due to a lack of perimeter strip.
Theactive crack continues to widen over time. The cause is not in the screed itself but underneath it: a moving slab, a flexing floor, or settlement. Treating it without addressing the underlying cause is pointless.
Place a plaster or glass tell-tale across the crack and date it. Monitor it for two to four weeks. If it breaks, the crack is still active, and a structural assessment is required before any repairs. If it remains intact, the crack is stable and can be treated.
The principle is to stitch the screed back together, not just cover up the crack. We open the crack into a V-shape, carefully remove all dust, and then inject it with epoxy resin. Metal staples are inserted perpendicular to the crack into grooves spaced 20 to 30 cm apart, followed by a finishing leveling compound.
Simply filling it with mortar will cause it to reopen with the first change in temperature. And the best repair is the one you never have to make: mistakes to avoid before pouring a screed prevent most of these issues.