Can screed be laid on a damp substrate?

No, not without identifying where the moisture comes from. A screed does not stop rising damp: it hides it, and then the floor covering lifts.

The answer depends entirely on the source of the moisture. A slab that is still damp from its own construction and a slab affected by rising damp are two unrelated situations, and confusing them is costly.

‍

Two types of moisture you shouldn't confuse

Theresidual construction moisture is found in a recent concrete slab that hasn't finished drying. It decreases over time and does not rule out laying a screed, provided you respect the drying times and break the contact with a membrane.

The rising damp is a completely different matter: water from the ground rises continuously through the slab due to the lack of a damp-proof membrane underneath. It will never disappear on its own. Pouring a screed over it just traps the problem: six months later, the tiles come loose, the parquet warps, and the skirting boards turn black.

‍

A simple test before you decide

Tape a square of plastic film about 50 cm wide onto the substrate, sealing the edges, and leave it in place for 24 to 48 hours. If condensation appears under the film or if the concrete darkens in that spot, the substrate is releasing moisture. This test doesn't replace a professional measurement, but it is enough to trigger the right reaction: find the cause before covering it up.

‍

What to do before pouring

  • On a slab-on-grade without waterproofing: install a membrane before the insulation, and treat the cause if the water is coming from the walls.
  • Above a crawl space that is damp: check its ventilation before insulating.
  • In all cases: install a separation film, the role and limitations of which are detailed in our guide do you need a vapor barrier under a screed.

The choice of insulation then depends directly on the substrate: our guide which floor insulation to choose based on the substrate details the various scenarios.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.