How do you know a screed is really dry?

Only a carbide bomb test counts, on a sample taken through the full depth. A screed that feels dry can still be very wet at its core.

This is the most expensive question to answer by eye. A screed that looks light, hard, and dry to the touch can still contain a lot of water three centimeters deep. Installing flooring over this screed means trapping that water under an airtight barrier.

‍

The only measurement that counts

The reference method is the calcium carbide meter, also known as the CM test. A sample is taken with a chisel through the entire thickness, crushed, and then reacted with calcium carbide in a pressure vessel. The resulting pressure indicates the actual moisture content of the mass.

The thresholds commonly required before installing flooring are as follows:

  • Cement screed : 2% CM maximum, and 1.5% if it is a heated screed.
  • Anhydrite screed : 0.5% CM maximum, and 0.3% if it is a heated screed.

The difference between the two types is significant and often surprising: an anhydrite screed must be significantly drier than a cement screed before receiving flooring. The specifications of the flooring and mortar manufacturer always take precedence over these values.

‍

Indicative methods and their limitations

A pin-type or capacitive moisture meter provides an immediate reading, but it only measures the first few millimeters. It is useful for comparing different areas, not for deciding whether to proceed with installation.

The plastic film test remains useful as a free preliminary check: a square of polyethylene taped down hermetically for 24 to 48 hours. If condensation appears underneath, there is no need to go any further; the screed is not ready.

‍

Do not confuse timeframes with measurements

The rule of one week per centimeter up to four or five centimeters, and much slower thereafter, provides a rough idea for project planning. It never replaces a measurement, as drying also depends on ventilation, the season, and the type of mortar.

Our article drying the screed before tiling or parquet flooring details the timeframes for each type of flooring. And if the schedule is tight, first look at what is reasonable to do to speed up drying.

Most recent questions

During the works
Renovation

Do you need to move out while screed is laid?

Rarely overnight, but the rooms concerned are out of use for 24 to 48 hours. In an occupied renovation you need a refuge zone and a clear way out.

During the works
Renovation

How much does a screed weigh on the structure?

About 20 kg per m² for each centimetre of thickness. A 6 cm screed therefore weighs 120 kg/m², before insulation and the final covering.

During the works
Traditional screed
Underfloor heating

Why does a screed need movement joints?

Because a screed expands and shrinks. Without joints it cracks wherever it likes; with joints it breaks where you decided it should.

During the works
Traditional screed

Does a screed need reinforcement mesh?

Not always. Mesh is needed on a floating screed, over underfloor heating and on large areas. On a thin bonded screed it is often unnecessary.