How do you measure the height available to insulate a floor?

Start from the finished floor level set by thresholds and adjoining rooms, measure down to the highest point of the slab, then subtract the floor finish and the screed: what is left is the space for insulation.

When renovating, the available height almost always dictates the type of insulation. Measuring it correctly before requesting a quote prevents the discovery on-site that you are three centimetres short.

‍

First, determine the finished floor level

The finished level cannot be chosen freely. It is dictated by fixed elements that cannot be moved: exterior door thresholds, stair treads, the floors of adjacent rooms that are not being renovated, and the clearance under interior doors. The most restrictive of these reference points sets the level.

‍

Measure at the highest point of the slab

An old slab is rarely level. Measure the distance between the slab and the finished level at several points, room by room, and use the smallest value: this is what limits the thickness you can install throughout. Also, note the height of any conduits and pipes laid on the slab.

‍

Remove the flooring and screed, in that order

From the total, first subtract the flooring and its adhesive, then the minimum thickness of the planned screed, as detailed in our article on screed thickness according to type and substrate. What remains is the space available for insulation.

With this height, the thermal resistance achievable is determined by the lambda value of each insulation material. When space is limited, an insulation material with a low lambda value, such as sprayed PUR, makes all the difference, as explained in our article on the insulating screed.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.

Need a reliable partner for solid screeds, or thermal or acoustic insulation?

Contact us
Arrow right icon