Can a poorly levelled screed be ground down or repaired?

Yes: high spots are ground down, low spots filled with levelling compound. The limits are the remaining thickness and, on a heated screed, the pipe positions.

A screed that is out of tolerance does not mean the project is doomed. In the vast majority of cases, it can be corrected, provided you choose the right technique depending on whether there is an excess or a lack of material.

‍

High spots: sanding or planing

A bump is treated by abrasion using a surface grinder or a diamond sander. The operation is dusty but effective for a few millimeters, and it also serves to remove overly dense surface laitance before applying a leveling compound.

There are two limits that should not be crossed. First, the residual thickness: going below the minimum thickness for the type of screed creates a weak spot. Second, and most importantly, underfloor heating loops and mesh. On a heated screed, sanding without a layout plan or a detector is a gamble: hitting a loop means having to locate a leak and perform partial demolition.

‍

Low spots: leveling

A hollow is filled using a self-leveling compound . Depending on the product, you generally work with a thickness ranging from a few millimeters to a centimeter, or more with specific repair mortars.

A bonding primer is not optional: without it, the leveling compound will peel off in patches a few months later. The difference in nature between these products and a true screed is explained in our article leveling compound or screed, and the distinction withself-leveling compound in our glossary.

‍

When correction is no longer the right answer

Beyond one or two centimeters of deviation, or when the screed is generally powdery, correction becomes more expensive and less reliable than a fundamental solution. Two paths remain open: covering it with a new floating screed if the height allows, or removing the existing screed.

Before incurring costs, it is useful to check whether the observed deviation actually falls outside the accepted tolerances: our fact sheet on screed flatness provides the orders of magnitude and the measurement method.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.