How much does a screed weigh on the structure?

About 20 kg per m² for each centimetre of thickness. A 6 cm screed therefore weighs 120 kg/m², before insulation and the final covering.

In new construction, the question doesn't arise: the structure has been sized for it. In renovation, it sometimes becomes the deciding factor for the entire technical solution.

‍

The calculation, in a nutshell

A cement screed weighs about 2,000 kg per cubic meter, which is 20 kg per square meter per centimeter of thickness. So, you can do the math in your head:

  • 4 cm screed: about 80 kg/m²;
  • 6 cm screed: about 120 kg/m²;
  • 8 cm screed: about 160 kg/m².

A anhydrite screed falls into the same order of magnitude. To this weight, you must add the insulation and then the final flooring: bonded tiles add another 25 to 40 kg/m².

‍

When this weight becomes a problem

On a concrete slab or on hollow-core slabs, this permanent load is absorbed without difficulty. The issue becomes more complex with old wooden floors, which were designed at a time when neither screeds nor tiling were planned for upper floors.

You must then think in terms of added permanent load, not live load: the weight of the screed is added to that of the structure, even before a single piece of furniture is placed. When in doubt, only a verification by a structural engineer is definitive. Our guide on screeds on wooden floors details the process.

‍

Lightweight alternatives

When the structure cannot support the load, there are two options. The lightweight screedfilled with polystyrene beads or lightweight aggregates, drops to 6 or 12 kg per m² per centimeter, at the cost of lower mechanical strength and conductivity. The dry screed in panels remains under 40 kg/m² all-inclusive, insulation included, and introduces no water into the building.

Most recent questions

Drying and commissioning
Traditional screed
Liquid screed

How do you know a screed is really dry?

Only a carbide bomb test counts, on a sample taken through the full depth. A screed that feels dry can still be very wet at its core.

During the works
Renovation

Do you need to move out while screed is laid?

Rarely overnight, but the rooms concerned are out of use for 24 to 48 hours. In an occupied renovation you need a refuge zone and a clear way out.

During the works
Traditional screed
Underfloor heating

Why does a screed need movement joints?

Because a screed expands and shrinks. Without joints it cracks wherever it likes; with joints it breaks where you decided it should.

During the works
Traditional screed

Does a screed need reinforcement mesh?

Not always. Mesh is needed on a floating screed, over underfloor heating and on large areas. On a thin bonded screed it is often unnecessary.

Need a reliable partner for solid screeds, or thermal or acoustic insulation?

Contact us
Arrow right icon