How much does a screed weigh on the structure?

About 20 kg per m² for each centimetre of thickness. A 6 cm screed therefore weighs 120 kg/m², before insulation and the final covering.

In new construction, the question doesn't arise: the structure has been sized for it. In renovation, it sometimes becomes the deciding factor for the entire technical solution.

‍

The calculation, in a nutshell

A cement screed weighs about 2,000 kg per cubic meter, which is 20 kg per square meter per centimeter of thickness. So, you can do the math in your head:

  • 4 cm screed: about 80 kg/m²;
  • 6 cm screed: about 120 kg/m²;
  • 8 cm screed: about 160 kg/m².

A anhydrite screed falls into the same order of magnitude. To this weight, you must add the insulation and then the final flooring: bonded tiles add another 25 to 40 kg/m².

‍

When this weight becomes a problem

On a concrete slab or on hollow-core slabs, this permanent load is absorbed without difficulty. The issue becomes more complex with old wooden floors, which were designed at a time when neither screeds nor tiling were planned for upper floors.

You must then think in terms of added permanent load, not live load: the weight of the screed is added to that of the structure, even before a single piece of furniture is placed. When in doubt, only a verification by a structural engineer is definitive. Our guide on screeds on wooden floors details the process.

‍

Lightweight alternatives

When the structure cannot support the load, there are two options. The lightweight screedfilled with polystyrene beads or lightweight aggregates, drops to 6 or 12 kg per m² per centimeter, at the cost of lower mechanical strength and conductivity. The dry screed in panels remains under 40 kg/m² all-inclusive, insulation included, and introduces no water into the building.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.