Does a screed need reinforcement mesh?

Not always. Mesh is needed on a floating screed, over underfloor heating and on large areas. On a thin bonded screed it is often unnecessary.

This is one of the most misunderstood questions in the trade. A mesh does not make a screed unbreakable, nor does it prevent cracks from appearing. Its role is more modest and specific: to keep the edges of a crack tight so that it remains invisible and inconsequential beneath the flooring.

‍

When it is essential

  • Floating screed over insulation : the substrate is compressible, and the screed acts like a slab resting on a mattress. Reinforcement is the standard here.
  • Screed over underfloor heating : heating and cooling cycles put constant stress on the mortar. See our guide to screeds and underfloor heating.
  • Large areas without frequent joints, and substrates prone to movement, such as wooden floors.

Conversely, on a bonded screed that is thin and directly attached to the slab, mesh provides almost no benefit: the slab is already doing the work.

‍

Mesh or fibers?

Fibers, whether polypropylene or metallic, are mixed directly into the mortar. They distribute resistance throughout the entire mass and effectively manage shrinkage during the initial setting phase. Mesh, on the other hand, acts in a single plane but is better at handling bending stresses on deformable substrates.

The two are not mutually exclusive: for a large-area heated screed, combining fibers and mesh is common. On an anhydrite screed, however, shrinkage is so minimal that reinforcement is generally not required.

‍

The most common installation error

Mesh laid flat on the insulation and then covered with mortar is useless. It must be positioned within the mass, approximately in the lower third or at mid-thickness, which requires lifting it as you go or placing it on spacers. The panels should overlap by at least one mesh width, and the mesh must never touch the perimeter strip, otherwise you risk creating the rigid bridge you were trying to avoid. If placed incorrectly, it won't hold anything the day the screed cracks.

Most recent questions

During the works
Insulation
Underfloor heating

Can underfloor heating be laid directly on the insulation?

Yes, that is the rule: the pipes are fixed on the insulation layer, then embedded in the screed. The insulation must be flat, resist compression and be covered with a membrane.

Before the works
Insulation
Renovation

Should you insulate an upper floor above a heated room?

Thermally, hardly: heat does not leak between two heated rooms. Upstairs, acoustic insulation against impact noise is what matters, except above an unheated space.

During the works
Insulation

How long between sprayed PUR and the screed?

Sprayed PUR sets in under 24 hours. The screed can follow as soon as the foam is sanded level and covered with a membrane, often within a few days depending on the site schedule.

Before the works
Insulation

Is sprayed PUR affected by moisture in the base?

Once in place, closed-cell PUR absorbs little water. But it must be sprayed onto a dry base, and it does not replace treating moisture rising from the ground.

Need a reliable partner for solid screeds, or thermal or acoustic insulation?

Contact us
Arrow right icon