Does a screed need reinforcement mesh?

Not always. Mesh is needed on a floating screed, over underfloor heating and on large areas. On a thin bonded screed it is often unnecessary.

This is one of the most misunderstood questions in the trade. A mesh does not make a screed unbreakable, nor does it prevent cracks from appearing. Its role is more modest and specific: to keep the edges of a crack tight so that it remains invisible and inconsequential beneath the flooring.

‍

When it is essential

  • Floating screed over insulation : the substrate is compressible, and the screed acts like a slab resting on a mattress. Reinforcement is the standard here.
  • Screed over underfloor heating : heating and cooling cycles put constant stress on the mortar. See our guide to screeds and underfloor heating.
  • Large areas without frequent joints, and substrates prone to movement, such as wooden floors.

Conversely, on a bonded screed that is thin and directly attached to the slab, mesh provides almost no benefit: the slab is already doing the work.

‍

Mesh or fibers?

Fibers, whether polypropylene or metallic, are mixed directly into the mortar. They distribute resistance throughout the entire mass and effectively manage shrinkage during the initial setting phase. Mesh, on the other hand, acts in a single plane but is better at handling bending stresses on deformable substrates.

The two are not mutually exclusive: for a large-area heated screed, combining fibers and mesh is common. On an anhydrite screed, however, shrinkage is so minimal that reinforcement is generally not required.

‍

The most common installation error

Mesh laid flat on the insulation and then covered with mortar is useless. It must be positioned within the mass, approximately in the lower third or at mid-thickness, which requires lifting it as you go or placing it on spacers. The panels should overlap by at least one mesh width, and the mesh must never touch the perimeter strip, otherwise you risk creating the rigid bridge you were trying to avoid. If placed incorrectly, it won't hold anything the day the screed cracks.

Most recent questions

Drying and commissioning
Traditional screed
Liquid screed

How do you know a screed is really dry?

Only a carbide bomb test counts, on a sample taken through the full depth. A screed that feels dry can still be very wet at its core.

During the works
Renovation

Do you need to move out while screed is laid?

Rarely overnight, but the rooms concerned are out of use for 24 to 48 hours. In an occupied renovation you need a refuge zone and a clear way out.

During the works
Renovation

How much does a screed weigh on the structure?

About 20 kg per m² for each centimetre of thickness. A 6 cm screed therefore weighs 120 kg/m², before insulation and the final covering.

During the works
Traditional screed
Underfloor heating

Why does a screed need movement joints?

Because a screed expands and shrinks. Without joints it cracks wherever it likes; with joints it breaks where you decided it should.